
Plan A’s Key Responsibilities
- Established and implemented design procedures and protocols that have been specifically tailored for Manchester Engineering Campus Development.
- Prepared a Design Management strategy to make sure that the factors for project success were identified early, effectively communicated with all participants in the architectural and engineering teams and monitored as the process unfolded.
- Set up a meeting strategy for the project and participated, recorded and tracked actions raised at each of these design sessions.
- Managed updates to sub-consultant Contracts and prepared final documents.
- Project: The Manchester Engineering Campus, Manchester, UK
- Sector: Education
- Architect: Mecanoo
- Client: The University of Manchester
- Size: 81,000 m2
- Structural engineering: Arup
- MEP engineering: Arup
- Plan A Appointed: RIBA Stages 3-4