LSE Firoz Lalji Global Hub, London, UK

Located at 35 Lincoln’s Inn Fields, the building is a new addition to the London School of Economics’ (LSE) central London campus.

It will feature conference facilities, academic and teaching spaces, digital labs, and a 250-seat theatre. By embracing adaptive re-use, the design aligns with the ethos of the new centre, preserving much of the existing structure to support LSE’s goal of achieving its first net-zero carbon building.

Image Credits: David Chipperfield Architects London

Plan A’s Key Responsibilities

  • Defined project protocols and facilitated early discussions with the design team to define roles & responsibilities across work stages.
  • Developed detailed route maps to strategically plan and manage the design process, including: survey procurement, regulatory approvals, stakeholder engagement, value engineering, and overlapping design & procurement work stages.
  • Led progress monitoring and provided ongoing support to track and resolve key design issues.
  • Provided strategic advice and developed bespoke sustainability route maps to negotiate complex sustainability targets, including embodied and operational net zero carbon standards as well as Passivhaus and BREEAM/WELL certification. Plan A worked to align specialist consultant scopes required to ensure that the specific requirements for each sustainability workstream could be achieved at the right time during the design process.
  • Project: LSE Firoz Lalji Global Hub, London, UK

  • Sector: Education

  • Architect: David Chipperfield Architects London

  • Client: London School of Economics (LSE)

  • Size: 11,500 m²

  • Executive architect: Adamson Associates International

  • Contractor: McLaren Construction

  • Engineer: AKTII (Structure, Façade, Civil), Arup (Multi), Max Fordham (Passivhaus)

  • Plan A Appointed: RIBA Stage 1 - 4